By brainwashcloth
Mon Mar 31, 2003 3:47 pm
yes enter a program change in step edit. make sure your program is set to responde to program changes.
Will the program change be saved with the sequence? I am hoping to be able to load a series of programs and sequences to play a continuous set using a series of pattens. I need to be able to load, say 10 sequences and switch them manualy. >>will I have to assign program numbers at the start of each set???

By ieism
Tue Apr 01, 2003 8:37 am
I'm not in front of my MPC right now, so i can't check. But i'm pretty sure prm. changes save with the sequence.
So if you load up your 10 sequences, they should change programs as soon as you hit the next sequence.
I doubt you'll be able to load 10 full programs though, as you can only load about 250 samples at a time.
So if you load up your 10 sequences, they should change programs as soon as you hit the next sequence.
I doubt you'll be able to load 10 full programs though, as you can only load about 250 samples at a time.