
By djadonis206
Mon Aug 01, 2016 6:19 am
Hi there,
In the edit menu (f2), the start time and end time seem to be tied together. In other words, turning the job wheel on either the start or end points makes the opposite match the specific time of the other.
So if I start with 1.1.00 - 1.1.00 and I set the end point to 2.1.0 the start point goes to 2.1.0 as well.
This makes it impossible for me to select a range of notes or events.
Can anyone help?
Thanks,
Adonis
In the edit menu (f2), the start time and end time seem to be tied together. In other words, turning the job wheel on either the start or end points makes the opposite match the specific time of the other.
So if I start with 1.1.00 - 1.1.00 and I set the end point to 2.1.0 the start point goes to 2.1.0 as well.
This makes it impossible for me to select a range of notes or events.
Can anyone help?
Thanks,
Adonis






